Nothing Special   »   [go: up one dir, main page]

Skip to main content

Accelerating Workflows with Fixed Date Constraints

  • Conference paper
Conceptual Modeling – ER 2005 (ER 2005)

Part of the book series: Lecture Notes in Computer Science ((LNISA,volume 3716))

Included in the following conference series:

Abstract

Workflow systems execute workflows and assign work items to the work list of participants. As work lists usually hold multiple work items, participants have to decide which work item to handle next. When selecting a specific work item other work items must be postponed, which will in succession delay their appendant workflows. This may lead to disproportionately increased execution durations and turn around times if fixed-date constraints are defined on succeeding tasks. We propose a probabilistic method which assists the participant when deciding which work item to handle next, with the intention to decrease turnaround times and to avoid time-related escalations, by providing information about the delay to expect when postponing tasks.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Subscribe and save

Springer+ Basic
$34.99 /Month
  • Get 10 units per month
  • Download Article/Chapter or eBook
  • 1 Unit = 1 Article or 1 Chapter
  • Cancel anytime
Subscribe now

Buy Now

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 39.99
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 54.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Preview

Unable to display preview. Download preview PDF.

Unable to display preview. Download preview PDF.

Similar content being viewed by others

References

  1. van der Aalst, W.M.P., Reijers, H.A.: Analysis of discrete-time stochastic petrinets. Statistica Neerlandica, Journal of the Netherlands Society for Statistics and Operations Research 58(2) (2003)

    Google Scholar 

  2. Bussler, C.: Workflow Instance Scheduling with Project Management Tools. In: 9th Workshop DEXA 1998. IEEE Computer Society Press, Los Alamitos (1998)

    Google Scholar 

  3. Baggio, G., Wainer, J., Ellis, C.A.: Applying Scheduling Techniques to Minimize the Number of Late Jobs in Workflow Systems. In: Proc. of the 2004 ACM Symposium on Applied Computing (SAC). ACM Press, New York (2004)

    Google Scholar 

  4. Bettini, C., Wang, X.X., Jajodia, S.: Temporal reasoning in workflow systems. Distributed and Parallel Databases 3 (May 2002)

    Google Scholar 

  5. Combi, C., Pozzi, G.: Temporal conceptual modelling of workflows. In: Song, I.-Y., Liddle, S.W., Ling, T.-W., Scheuermann, P. (eds.) ER 2003. LNCS, vol. 2813, pp. 59–76. Springer, Heidelberg (2003)

    Chapter  Google Scholar 

  6. Eder, J., Pichler, H.: Duration Histograms for Workflow Systems. In: Proc. of the Conf. on Engineering Information Systems in the Internet Context 2002. Kluwer Academic Publishers, Dordrecht (2002)

    Google Scholar 

  7. Eder, J., Panagos, E.: Managing Time in Workflow Systems. In: Workflow Handbook 2001. Future Strategies INC. in association with Workflow Management Coalition (2000)

    Google Scholar 

  8. Eder, J., Gruber, W., Ninaus, M., Pichler, H.: Personal Scheduling for Workflow Systems. In: van der Aalst, W.M.P., ter Hofstede, A.H.M., Weske, M. (eds.) BPM 2003. LNCS, vol. 2678, pp. 216–231. Springer, Heidelberg (2003)

    Chapter  Google Scholar 

  9. Gruber Modeling, W.: Transformation of Workflows with Temporal Constraints. Akademische Verlagsgesellschaft, Berlin (2004)

    Google Scholar 

  10. Gillmann, M., Weikum, G., Wonner, W.: Workflow management with service quality guarantees. In: Proc. of the 2002 ACM SIGMOD Int. Conf. on Management of Data. ACM Press, New York (2002)

    Google Scholar 

  11. Marjanovic, O., Orlowska, M.: On modeling and verification of temporal constraints in production workflows. Knowledge and Information Syst. 1(2) (1999)

    Google Scholar 

  12. Panagos, E., Rabinovich, M.: Predictive workflow management. In: Proc. of the 3rd Int. Workshop on Next Generation Information Technologies and Systems, Neve Ilan, Israel (June 1997)

    Google Scholar 

  13. Sadiq, S., Marjanovic, O., Orlowska, M.E.: Managing Change and Time in Dynamic Workflow Processes. International Journal of Cooperative Information Systems 9(1 & 2) (March - June 2000)

    Google Scholar 

  14. Interface 1: Process Definition Interchange - Process Model. Workflow Management Coalition Specification. Document number TC00-1016-P

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2005 Springer-Verlag Berlin Heidelberg

About this paper

Cite this paper

Bierbaumer, M., Eder, J., Pichler, H. (2005). Accelerating Workflows with Fixed Date Constraints. In: Delcambre, L., Kop, C., Mayr, H.C., Mylopoulos, J., Pastor, O. (eds) Conceptual Modeling – ER 2005. ER 2005. Lecture Notes in Computer Science, vol 3716. Springer, Berlin, Heidelberg. https://doi.org/10.1007/11568322_22

Download citation

  • DOI: https://doi.org/10.1007/11568322_22

  • Publisher Name: Springer, Berlin, Heidelberg

  • Print ISBN: 978-3-540-29389-7

  • Online ISBN: 978-3-540-32068-5

  • eBook Packages: Computer ScienceComputer Science (R0)

Publish with us

Policies and ethics