Nothing Special   »   [go: up one dir, main page]

CERN Accelerating science

Article
Report number FERMILAB-CONF-23-0891-TD
Title AUP First Pre-Series Cryo-Assembly Design Production and Test Overview
Author(s) Feher, S (Fermilab) ; Ambrosio, G (Fermilab) ; Apollinari, G (Fermilab) ; Baldini, M (Fermilab) ; Bossert, R (Fermilab) ; Carcagno, R (Fermilab) ; Chlachidze, G (Fermilab) ; DiMarco, J (Fermilab) ; Rabehl, R (Fermilab) ; Stoynev, S (Fermilab) ; Strauss, T (Fermilab) ; Vouris, A (Fermilab) ; Prin, H (CERN) ; Ramos, D (CERN) ; Todesco, E (CERN) ; Ferracin, P (LBL, Berkeley) ; Vallone, G (LBL, Berkeley)
Publication 2024
Number of pages 5
In: IEEE Trans. Appl. Supercond. 34 (2024) 4005605
DOI 10.1109/TASC.2024.3379173
Subject category Accelerators and Storage Rings
Abstract New high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) have been built and tested as part of the high-luminosity upgrade of the Large Hadron Collider (HL-LHC). These new quadrupole magnets are based on Nb3Sn superconducting technology. The US Accelerator Upgrade Project (US-AUP) is producing the Q1 and Q3 Cryo-Assemblies: a pair of ∼5 m long magnet structures installed in a stainless-steel helium vessel (Cold Mass) and surrounded by cryostat shields, piping, and a vacuum vessel. This paper gives an overview of the design, production, and the results of the horizontal test of the first pre-series Q1/Q3 Cryo-Assembly.
Copyright/License © 2024 IEEE

Corresponding record in: Inspire


 Registre creat el 2024-06-12, darrera modificació el 2024-06-12


Fermilab Library Server:
Descarregar el text completPDF
Enllaç extern:
Descarregar el text completFermilab Library Server