Title Electrical insulation testing for ITER fusion tokamak
Author(s) Gaxiola, E (Euratom, St. Paul Lez Durance) ; Evans, D (Euratom, St. Paul Lez Durance) ; Laquiere, J (Euratom, St. Paul Lez Durance) ; Laurenti, A (Euratom, St. Paul Lez Durance) ; Libeyre, P (Euratom, St. Paul Lez Durance) ; Lyraud, C (Euratom, St. Paul Lez Durance) ; Piccin, R (Euratom, St. Paul Lez Durance) ; Rinaudo, G (Euratom, St. Paul Lez Durance) ; Simon, F (Euratom, St. Paul Lez Durance) ; Vollmann, T (Euratom, St. Paul Lez Durance) ; Martovetsky, N (Oak Ridge, U.S. ITER) ; Niu, E (China International Nuclear Fusion Energy Program Execution Center, Beijing) ; Langeslag, S (CERN) ; Sgobba, S (CERN) ; Khumthong, K (General Atomics, San Diego) ; Norausky, N (General Atomics, San Diego) ; Smith, J (General Atomics, San Diego) ; Wei, J (Hefei, Inst. Plasma Phys.) ; Wu, H (Hefei, Inst. Plasma Phys.) ; Yu, X (Hefei, Inst. Plasma Phys.)
Publication 2017
Number of pages 4
In: 35th IEEE Electrical Insulation Conference, Baltimore, MD, USA, 11 - 14 Jun 2017, pp.408-411
DOI 10.1109/EIC.2017.8004670
Subject category Engineering
Abstract The uniqueness of the ITER fusion project drives purpose and scope here to fulfil (functional) Procurement Arrangement (PA) requirements for the Central Solenoid (CS) and Correction Coil (CC) magnets' electrical insulation [1-3]; as used and undertaken for covering high voltage testing operations of the magnet coil winding pack (WP) vacuum pressure insulation (VPI) beam qualification, followed in 2016 by start of magnets series production in the USA and China [1, 2]. Useful to be considered common state-of-the-art electrical power components testing practices [3, 4] are presented here as performed to verify that the integrity and insulation of the various components are within acceptable limits during different phases of the fabrication and to certify acceptance on delivery of the complete coils. Initial measurement plans were complemented into electrical tests with typical high voltage engineering implemented measures as a pre-requisite to successfully validate produced results. The above permitted the first quantitative validation of the obtained final production, including life time behavior.

Corresponding record in: Inspire


 Record created 2018-02-09, last modified 2018-06-08