2015 availability summary (p. 19) |
by Apollonio, A |
QPS - operational aspects (p. 29) |
by Pojer, M |
LHC cryogenics – Run2 (2015) summary and perspectives (p. 33) |
by Brodzinski, K |
R2E – is it still an issue? (p. 39) |
by Danzeca, S |
LHC RF system reliability (p. 43) |
by Brunner, O |
LHC nominal cycle (p. 45) |
by Camillocci, M Solfaroli |
Injection (p. 49) |
by Jacquet, D |
Tune and orbit feedbacks (p. 53) |
by Ponce, L |
Tune and chromaticity: decay and snapback (p. 59) |
by Schaumann, M |
Optics model (p. 65) |
by Langner, A |
Luminosity, emittance evolution and OP scans (p. 71) |
by Hostettler, M |
Luminosity modeling for the LHC (p. 77) |
by Papotti, G |
How to survive a UFO attack (p. 81) |
by Auchmann, B |
LHC aperture and ULO restrictions: are they a possible limitation in 2016? (p. 87) |
by Mirarchi, D |
Instabilities and beam induced heating in 2015 (p. 95) |
by Carver, L R |
Performance limitations from electron cloud in 2015 (p. 101) |
by Iadarola, G |
Beam-beam effects long-range and head-on (p. 111) |
by Pieloni, T |
TDI - past observations and improvements for 2016 (p. 123) |
by Lechner, A |
LHC transverse feedback (p. 131) |
by Butterworth, A |
Instability diagnostics (p. 137) |
by Levens, T |
Operational and beam dynamics aspects of the RF system in 2015 (p. 143) |
by Timko, H |
Performance of the LHC collimation system during 2015 (p. 149) |
by Valentino, G |
Status of the beam instrumentation after LS1 (p. 155) |
by Bravin, E |
Status of the beam profile measurements at the LHC (p. 163) |
by Trad, G |
Controls - an OP perspective (p. 171) |
by Fuchsberger, K |
Feedback on controls from 2015 operation (p. 177) |
by Gourber-Pace, Marine |
Have we been operating safely in 2015? (p. 181) |
by Wollmann, D |
How to obtain clean injections (p. 185) |
by Burkart, F |
BLM threshold evolution and 2016 proposal (p. 191) |
by Kalliokoski, M |
BLM thresholds and damage limits for collimators (p. 197) |
by Mereghetti, A |
LHC configuration: can we get to β * =40 CM? (p. 203) |
by Bruce, R |
How to fight collective effect limitations (p. 211) |
by Li, K |
LHC YETS recovery (p. 219) |
by Pojer, M |
Initial commissioning to stable beams (p. 223) |
by Salvachua, B |
MD priorities for RUN 2 (p. 227) |
by Uythoven, J |