Chamonix 2014 Conclusions: Main Points and Actions (p. 1) |
by Bordry, F |
Summary of Session 1: LS1, HW Commissioning, Powering Tests - Coming out of LS1 (p. 7) |
by Pojer, M |
Summary of Session 2: Injector Status and Beams for LHC, Dry Runs, Sector Tests with Beam (p. 10) |
by Steerenberg, R |
Summary of Session 3: 2015 Commissioning with Beam (p. 13) |
by Lamont, M |
Summary of Session 4: LHC: Challenges and Strategy for Run 2 (p. 16) |
by Salvachua, B |
Summary of Session 5: LIU (p. 21) |
by Meddahi, M |
Summary of Session 6: HL-LHC (p. 27) |
by Brüning, O S |
Summary of Session 7: Accelerator and non-LHC Experimental Areas Consolidation up to LS3 (p. 31) |
by Benedikt, M |
Summary of Session 8: Long Shutdown 2 Strategy and Preparation (p. 33) |
by Jimenez, J |
Non-conformities (solved and pending) on the Superconducting Circuits (p. 39) |
by Verweij, A |
Re-commissioning of the Superconducting Circuits (p. 44) |
by Solfaroli Camillocci, M |
Other Non-solved Non-conformities across the LHC Ring and Potential Impact on Performance (p. 47) |
by Baglin, V |
Expected Impact of Hardware Changes on Impedance and Beam-induced Heating during Run 2 (p. 53) |
by Salvant, B |
ADT and RF after LS1 (p. 60) |
by Butterworth, A |
LBDS and Kickers after LS1 (p. 65) |
by Bartmann, W |
LHC Injectors Complex Status (p. 71) |
by Hanke, K |
SPS Scrubbing Run in 2014 (p. 76) |
by Bartosik, H |
Operational Beams for the LHC (p. 80) |
by Papaphilippou, Y |
LHC Dry-Runs and Machine Check-out (p. 85) |
by Jacquet, D |
LHC Transfer Line and Sector Tests (p. 89) |
by Kain, V |
2015 Commissioning with Beam - Introduction (p. 93) |
by Lamont, M |
Experiments’ Expectations for 2015 (p. 96) |
by Gorini, B |
Baseline LHC machine parameters and configuration of the 2015 proton run (p. 100) |
by Bruce, R. |
Optics Options for the 2015 LHC Run (p. 107) |
by Giovannozzi, M |
Nominal Cycle and Options (p. 111) |
by Solfaroli Camillocci, M |
Scrubbing: Expectations and Strategy, Long Range Perspective (p. 114) |
by Iadarola, G |
Strategy for First Two Months of LHC Beam Commissioning (Commissioning to First Stable Beams) (p. 125) |
by Redaelli, S |
Overall Strategy for Run 2 (p. 129) |
by Wenninger, J |
Machine Protection Strategy for LHC Commissioning and Outlook for Future Challenges (p. 134) |
by Salvachua, B |
Machine Development Priorities (p. 138) |
by Uythoven, J |
BLM Threshold Strategy (UFOs and Quenches) (p. 143) |
by Auchmann, B |
R2E and Availability (p. 149) |
by Brugger, M |
Linac4: Progress on Hardware and Beam Commissioning (p. 161) |
by Lombardi, A M |
Protons: Baseline and Alternatives, Studies Plan (p. 166) |
by Rumolo, G |
Concerns with Low Emittance Beam Operation (p. 176) |
by Kain, V |
Other Means to increase the SPS 25ns Performance - Transverse Plane (p. 180) |
by Bartosik, H |
Other Means to Increase the SPS 25ns Performance - Longitudinal Plane (p. 185) |
by Argyropoulos, T |
Ions: Baseline, Studies Plan and Strategy for Pending Options (p. 192) |
by Bodendorfer, M |
HL-LHC Parameter and Layout Baseline (p. 198) |
by Fessia, P |
HL-LHC Magnet Roadmap (p. 202) |
by Todesco, E |
HL-LHC RF Roadmap (p. 209) |
by Calaga, R |
HL-LHC Alternative Scenarios (p. 217) |
by Tomás, R |
Collimation Upgrades for HL-LHC (p. 225) |
by Redaelli, S |
Down Selection Criteria and MDs Prior to LS3 (p. 232) |
by Arduini, G |
Linacs Consolidation (p. 239) |
by Scrivens, R |
PSB and PS Consolidation For LS2 and Beyond (p. 243) |
by Gilardoni, S |
SPS Consolidation for LS2 and Beyond (p. 249) |
by Ridewood, J |
AD and LEIR Consolidation (p. 257) |
by Eriksson, T |
North Area and East Area Consolidation (p. 261) |
by Efthymiopoulos, I |
Isolde and n_Tof Consolidation (p. 265) |
by Catherall, R |
Scope of the Long Shutdown 2 (optimisation of the period 2015-2018) (p. 270) |
by Jimenez, J M |
What has been Learnt from LS1 (p. 272) |
by Foraz, K |
Radiation Protection Aspects (p. 276) |
by Forkel-Wirth, D |
LIU Planned Activities (p. 281) |
by Chapochnikova, E |
HL-LHC Planned Activities during LS2 - Accelerator (p. 284) |
by Béjar Alonso, I |
LHC Experiments Upgrade and Maintenance (p. 288) |
by Riegler, W |
Long Shutdown 2 @ LHC (p. 290) |
by Bernardini, M |