calldocumentfacebookmessagemypartnerwindowsapplegoogleplayworkerroutecoinspinterestplaysearchsmartphonetwittercaraccordeonvideoarrowarrowdownloaddownloaduploadsection_scrollerglobemapIcon-Shop-Websitecontactenergyhomebridgeshighrisetunnelmininghousearrow-uparrow-downarrow-leftarrow-leftarrow-circle-rightchevron-right-circleuserexternlinkcartissuuclosekeystarweb

Most Pelješac

Klek, Croatia

The PELJESAC BRIDGE, with 2404 m length and 285m span, is designed as cable-stayed bridge. It will be connected to the pylon with 10 tensioned cables. The purpose of the bridge is to provide a fixed link from southeast Croatia to the rest of the country while bypassing Bosnia and Herzegovina's small coast at Neum.

Back to overview

Project data

Year of completion
2021
Country
Croatia
Zip/Postal Code
20356
City
Klek

Building data

Construction Type
Mast Pylon
Construction method
Automatic climbing Formwork
Section height
Lower pylon: 4.5m / upper pylon 4.0m
Section width
Lower pylon: 7.0m / upper pylon: 7.0m
Section length
Lower pylon: 10.2m / upper pylon: 2.2m
Number of sections
24
Pylon inclination
1.6°
Overall length of bridge
2404m
Cycle time
7-10 days

Systems used

Top 50
Xclimb 60