Abstract
Track maintenance work was planned using GA and GP,
with profit as the optimisation criteria. The results
where compared with an existing determinstic
technique.
It was found the GP method gave the best results, with
the GA method giving good results for a short section
(10 miles) and poor results for a long section (50
miles).
Users
Please
log in to take part in the discussion (add own reviews or comments).