Nothing Special   »   [go: up one dir, main page]

To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Shakedown cruise

From Wikipedia, the free encyclopedia

USS Independence during her initial shakedown cruise in 1959

Shakedown cruise is a nautical term in which the performance of a ship is tested. Generally, shakedown cruises are performed before a ship enters service or after major changes such as a crew change, repair, refit or overhaul. The shakedown cruise simulates working conditions for the vessel, for various reasons. For most new ships, the major reasons are to familiarise a crew with a new vessel and to ensure all of the ship's systems are functional.

YouTube Encyclopedic

  • 1/2
    Views:
    580
    328
  • West Wight Potter 19 - MaSaSa - Shake down cruise, 10/27/2018 Part III.
  • West Wight Potter 19 - MaSaSa - Shake down cruise, 10/27/2018 Part II.

Transcription

Overview

If the ship is the first of its class, it will likely also be performing its sea trials, a test of its performance. In this context, 'shakedown cruise' and 'sea trials' may be used interchangeably, though each has a slightly different meaning. In such a case, it is likely that the ship's systems will be pushed to redline, or maximum capacity, to demonstrate the class's speed and other important traits. Until bested by another ship of the same class, this shakedown performance will be the standard of the class's capabilities, and its success may determine whether the class is to enter full production.

In the travel industry a shakedown cruise is also undertaken to test the ship and service crew. These test cruises are sometimes made with passengers travelling at a discount.

Availability

A vessel is typically not committed to any timetables or tasks until it completes its shakedown cruise. As such, problems detected during the shakedown cruise can be fixed at minimal cost. While the ship is assigned to the industrial activity for this purpose, this period is known as an "availability". In the US Navy, the typical length of an availability is 45 to 120 days, and per regulation, must be completed no more than eleven months after the month the ship was first delivered. This is also known as a "post-shakedown availability".[1][2]

Famous examples

The USS Triton, a nuclear-powered radar picket submarine, was the first vessel to execute a submerged circumnavigation of Earth while on its shakedown cruise in early 1960. Triton is the only U.S. Navy ship to receive a Presidential Unit Citation for its shakedown cruise. USS Massachusetts's shakedown cruise was Operation Torch.

References

  1. ^ "ISR Glossary of Terms". fas.org. Retrieved 8 February 2018.
  2. ^ "Postshakedown Availability". fas.org. Retrieved 8 February 2018.
This page was last edited on 9 January 2024, at 02:58
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.