Computer Science ›› 2018, Vol. 45 ›› Issue (4): 89-93.doi: 10.11896/j.issn.1002-137X.2018.04.013
Previous Articles Next Articles
WU Jian-hui, HUANG Zhong-xiang, LI Wu, WU Jian-hui, PENG Xin and ZHANG Sheng
[1] GAO Y W.Sequencing the urban roads construction based onentropy weighting,grey relation analysis and TOPSIS[D].Beijing:Beijing Jiaotong University,2009.(in Chinese) 高跃文.基于熵-灰色关联-理想解法的城市道路建设时序规划研究[D].北京:北京交通大学,2009. [2] QI J D.Research on urban expressway construction sequencebased on traffic network impact[D].Changchun:Jinlin University,2016.(in Chinese) 齐景东.考虑网络交通影响的城市快速路建设时序研究[D].长春:吉林大学,2016. [3] LIANG Y,CHEN Y Y,REN F T.Project order decision of road network planning basing on the component importance analysis[J].Journal of Beijing University of Technology,2005,31(3):284-287.(in Chinese) 梁颖,陈艳艳,任福田.基于单元重要度分析的公路网规划项目建设序列论证[J].北京工业大学学报,2005,31(3):284-287. [4] QIN J,NI L L,DONG L Y,et al.Bi-level programming model and algorithm for transportation network design problem considering sustainable development [J].Journal of Transportation Systems Engineering and Information Technology,2010,10(4):111-117.(in Chinese) 秦进,倪玲霖,董龙云,等.考虑可持续发展的交通网络设计双层模型与算法[J].交通运输系统工程与信息,2010,10(4):111-117. [5] SONG X S,WANG X X,LI A Z,et al.Node importance evaluation method for highway network of urban agglomeration[J].Journal of Transportation Systems Engineering and Information Technology,2011,11(2):84-90.(in Chinese) 宋新生,王啸啸,李爱增,等.城市群区域公路网节点重要度评估方法研究[J].交通运输系统工程与信息,2011,11(2):84-90. [6] QU D Y,WANG W,DENG W.Order of item in the process of highway network planning based on AHP[J].China Journal of Highway and Transport,2000,13(3):64-68.(in Chinese) 曲大义,王炜,邓卫.基于系统层次分析法的公路网规划项目建设序列论证[J].中国公路学报,2000,13(3):64-68. [7] WANG Z B,CHEN Y Y,HAN D.Optimization method of project construction scheduling for intermodal hub[J].Journal of Jilin University(Engineering and Technology Edition),2012,42(4):899-903.(in Chinese) 王振报,陈艳艳,韩冬.城市客运交通枢纽建设时序优化方法[J].吉林大学学报(工学版),2012,42(4):899-903. [8] JANACKOVIC G L,SAVIC S M,STANKOVIC M S.Selection and ranking of occupational safety indicators based on fuzzy AHP:A case study in road construction companies[J].South African Journal of Industrial Engineering,2013,24(24):175-189. [9] GUO Y Y,LIU P,WU Y.Construction sequence of urban rail transit system based on cumulative prospect theory[J].Journal of Transportation Systems Engineering and Information Technology,2013,3(4):29-35.(in Chinese) 郭延永,刘攀,吴瑶.基于累计前景理论的城市轨道交通建设时序[J].交通运输系统工程与信息,2013,3(4):29-35. [10] GAO Y W,SHAO C F,DONG C J.Research on sequencing urban roads construction based improved TOPSIS[J].Road Traffic & Safety,2015(5):6-12.(in Chinese) 高跃文,邵春福,董春娇.基于改进理想解法的城市道路建设排序方法[J].道路交通与安全,2015(5):6-12. [11] ZHANG T,JIN J,SHEN L,et al.Decision method for urban railtransit constructiong scheme based on grey lattice order theory[J].Urban Mass Transit,2016,19(10):102-105.(in Chinese) 张桐,金键,沈犁,等.基于灰色格序决策理论的城市轨道交通建设项目时序确定方法[J].城市轨道交通研究,2016,19(10):102-105. [12] KIM B J,KIM W,SONG B H.Sequencing and scheduling highway network expansion using a discrete network design model[J].The Annals of Regional Science,2008,42(3):621-642. [13] DENG L B,HUO L.Dynamic programming method of the item order optimal for transportation network design[J].Operations Research and Management Science,2010,19(5):45-51.(in Chinese) 邓连波,霍亮.交通网络建设序列的动态规划方法[J].运筹与管理,2010,19(5):45-51. [14] YE Q,UKKUSURI S V.Resilience as an Objective in the Optimal Reconstruction Sequence for Transportation Networks[J].Journal of Transportation Safety & Security,2015,7(1):91-105. [15] SONG L Y,ZHANG W Y.Urban traffic organization with road blocking activities[J].Journal of Transportation Systems Engineering and Information Technology,2012,12(2):162-167.(in Chinese) 宋丽英,张文义.城市道路施工期间道路交通组织研究[J].交通运输系统工程与信息,2012,12(2):162-167. [16] LI X W.Quantiative analysis of traffic efficiency and its influencing factors[D].Beijing:Beijing Jiaotong University,2012.(in Chinese) 李晓蔚.城市道路通行效率及其影响因素的量化分析[D].北京:北京交通大学,2012. [17] SUN Q,WANG Q Y,GAO Y L.Multi-period bi-level programming model for regional comprehensive transport network design with uncertain demand[J].Journal of Transportation Systems Engineering and Information Technology,2011,11(6):111-116.(in Chinese) 孙强,王庆云,高咏玲.不确定需求条件下多阶段区域综合交通网络设计的双层规划模型[J].交通运输系统工程与信息,2011,11(6):111-116. [18] BIAN C Z,YU X X,LU H P.Multi-stage discrete network design under stochastic demand[J].Journal of Beijing University of Technology,2012,38(4):558-563.(in Chinese) 卞长志,蔚欣欣,陆化普.随机需求多阶段离散交通网络设计[J].北京工业大学学报,2012,38(4):558-563. [19] CHENG L,LI X Y,XU T.Sensitivity analysis of user equilibrium network based on network decomposition and composition[J].Systems Engineering-Theory & Practice,2014,34(2):502-508.(in Chinese) 程琳,李向阳,徐婷.基于网络分解与叠加的用户均衡网络敏感度分析[J].系统工程理论与实践,2014,34(2):502-508. [20] DU M,JIANG X,CHENG L.Estimating the Capacity of Urban Transportation Networks with an Improved Sensitivity Based Method[J].Discrete Dynamics in Nature & Society,2015,2015:1-13. [21] KUANG A W,HUANG Z X,ZHANG S.Stochastic assignment model based on generalized travel disutility under ATIS[J].System Engineering,2010,28(10):108-113.(in Chinese) 况爱武,黄中祥,张生.ATIS影响下基于广义出行负效用的随机分配[J].系统工程,2010,28(10):108-113. [22] KAROONSOONTAWONG A,LIN D Y.Combined GravityModel Trip Distribution and Paired Combinatorial Logit Stochastic User Equilibrium Problem[J].Networks and Spatial Economics,2015,15(4):1011-1048. |
No related articles found! |
|