News
Full closure of access road to Hahn Airport
The LBM Bad Kreuznach has announced that the direct access road to Hahn Airport (after exit B 50: between petrol station Bohr-Insel and airport - and in the opposite direction to the B 50) will be fully closed due to a necessary road renovation. The construction work will begin on 22.11.2024 at 08:00 a.m. and is expected to end on 06.12.2024 at 06 p.m.. A diversion route for car and truck traffic will be signposted.
We ask all passengers to allow a little more time for the journey to the airport.
The LBM Bad Kreuznach asks road users for their understanding for the expected disruption.
Tips for a stress-free start to your holiday
We would like to ask all passengers to plan more time for check-in and security checks. Therefore, we recommend arriving at the airport 3 hours before scheduled departure. In order to start your holiday relaxed, please note the following tips:
- Check that your ID-card is valid and that you have all the necessary travel documents to hand.
- Reserve your airport parking space online in advance: Hahn Airport (hahn-airport.de)
- Use the online check-in of your airline.
- If you already have a boarding pass and do not check in baggage, go directly to the board of control.
- To speed up the security check, please take only one piece of hand luggage with you.
- For hand luggage: Liquids and creams (up to 100 ml per container) must be packed in a 1-litre plastic bag. At the security check, please present this bag separately, without being asked, together with your technical equipment.
We wish you a pleasant journey!