Nothing Special   »   [go: up one dir, main page]

CERN Accelerating science

CERN Document Server 4 εγγραφές βρέθηκαν  Η έρευνα πήρε 1.39 δευτερόλεπτα. 
1.
Track Reconstruction with Cosmic Ray Data at the Tracker Integration Facility / CMS Collaboration
The subsystems of the CMS silicon strip tracker were integrated and commissioned at the Tracker Integration Facility (TIF) in the period from November 2006 to July 2007. As part of the commissioning, large samples of cosmic ray data were recorded under various running conditions in the absence of a magnetic field. [...]
CMS-NOTE-2009-003.- Geneva : CERN, 2008 - 36 p. Fulltext: PDF;
2.
Alignment of the CMS Silicon Strip Tracker during stand-alone Commissioning / CMS Collaboration
The results of the CMS tracker alignment analysis are presented using the data from cosmic tracks, optical survey information, and the laser alignment system at the Tracker Integration Facility at CERN. During several months of operation in the spring and summer of 2007, about five million cosmic track events were collected with a partially active CMS Tracker. [...]
arXiv:0904.1220; CMS-NOTE-2009-002; CMS-NOTE-2009-002; FERMILAB-PUB-09-543-CMS.- 2009 - 41 p. - Published in : JINST 4 (2009) T07001 Fulltext: jinst9_07_t07001 - PDF; arXiv:0904.1220 - PDF; External link: Preprint
3.
Stand-alone Cosmic Muon Reconstruction Before Installation of the CMS Silicon Strip Tracker / CMS Tracker Collaboration
The subsystems of the CMS silicon strip tracker were integrated and commissioned at the Tracker Integration Facility (TIF) in the period from November 2006 to July 2007. As part of the commissioning, large samples of cosmic ray data were recorded under various running conditions in the absence of a magnetic field. [...]
arXiv:0902.1860.- 2009 - 29 p. - Published in : JINST 4 (2009) P05004 Fulltext: PDF; SISSA/IOP Open Access article : PDF;
4.
Performance studies of the CMS Strip Tracker before installation / CMS Tracker Collaboration
In March 2007 the assembly of the Silicon Strip Tracker was completed at the Tracker Integration Facility at CERN. Nearly 15% of the detector was instrumented using cables, fiber optics, power supplies, and electronics intended for the operation at the LHC. [...]
arXiv:0901.4316; CMS-NOTE-2008-032.- Geneva : CERN, 2009 - 40 p. - Published in : JINST 4 (2009) P06009 Fulltext: jinst9_06_p06009 - PDF; arXiv:0901.4316 - PDF; External link: Preprint

Δείτε ακόμη: παρόμοια ονόματα συγγραφέων
1 Hinchey, Carl Louis
Ενδιαφέρεστε να ενημερώνεστε για νέα αποτελέσματα σχετικά με το ερώτημα αυτό;
Δημιουργήστε ένα προσωπικό email alert ή εγγραφείτε στο RSS feed.
Δεν βρήκατε αυτό που αναζητούσατε; Δοκιμάστε την έρευνά σας σε άλλους servers:
Hinchey, C. σε Amazon
Hinchey, C. σε CERN EDMS
Hinchey, C. σε CERN Intranet
Hinchey, C. σε CiteSeer
Hinchey, C. σε Google Books
Hinchey, C. σε Google Scholar
Hinchey, C. σε Google Web
Hinchey, C. σε IEC
Hinchey, C. σε IHS
Hinchey, C. σε INSPIRE
Hinchey, C. σε ISO
Hinchey, C. σε KISS Books/Journals
Hinchey, C. σε KISS Preprints
Hinchey, C. σε NEBIS
Hinchey, C. σε SLAC Library Catalog
Hinchey, C. σε Scirus