Nothing Special   »   [go: up one dir, main page]

CERN Accelerating science

If you experience any problem watching the video, click the download button below
Download Embed
Preprint
Report number CERN-ACC-2022-0007 ; CLIC-Note-1176
Title DC Beam Stability issues in the first commercial prototype of a High Efficiency 8MW X-Band Klystron
Author(s) Syratchev, Igor (CERN) ; Un Nisa, Zaib (CERN) ; Cai, Jinchi (Lancaster University (GB)) ; Burt, Graeme Campbell (Lancaster University (GB)) ; Anno, Toshiro (Canon Electron Tubes & Devices Co., Ltd (CETD))
Publication 2022
Imprint 11 May 2022
Number of pages 13
Subject category Accelerators and Storage Rings
Study CLIC
Abstract The first commercial prototype of the new High Efficiency (HE) 8MW klystron was built and tested at CETD in the fall of 2021. Unexpectedly, in the first tests with DC beam at different beam voltages, a number of instabilities (self-oscillations) at 21-23GHz were found. As a result, at CERN, we have launched and completed a dedicated investigation program to analyse these instabilities and developed special mitigation measures for minimization of their impact on the klystron fabrication processes. In this paper, we will report the outcome of these studies.
Submitted by alexia.augier@cern.ch

 


 Rekord stworzony 2022-06-17, ostatnia modyfikacja 2024-10-25


Pełny tekst:
Pobierz pełny tekst
PDF