Nothing Special   »   [go: up one dir, main page]

CERN Accelerating science

Article
Title Deployment and Commissioning of the CERN PS Injection Kicker System for Operation with 2 GeV Beams in Short Circuit Mode
Related titleDEPLOYMENT AND COMMISSIONING OF THE CERN PS INJECTION KICKER SYSTEM FOR OPERATION WITH 2 GeV BEAMS IN SHORT CIRCUIT MODE
Author(s) Kramer, Thomas (CERN) ; Ayala Cintas, Nuria (CERN) ; Borburgh, Jan (CERN) ; Burkel, Peter (CERN) ; Carlier, Etienne (CERN) ; Ducimetière, Laurent (CERN) ; Feliciano, Luís M C (CERN) ; Ferrero Colomo, Álvaro (CERN) ; Fraser, Matthew A (CERN) ; Govertsen, Leif A (CERN) ; Noulibos, Remy (CERN) ; Pavis, Steven (CERN) ; Sermeus, Luc (CERN)
Publication Geneva : JACoW, 2021
Number of pages 4
In: JACoW IPAC 2021 (2021) 4489-4492
In: 12th International Particle Accelerator Conference (IPAC 2021), Online, 24 - 28 May 2021, pp.4489-4492
DOI 10.18429/JACoW-IPAC2021-THPAB354 (publication)
Subject category Accelerators and Storage Rings
Abstract Within the framework of the LHC Injector Upgrade (LIU) project, the feasibility and design of an upgrade of the existing CERN PS proton injection kicker system have been outlined in previous publications already. This paper describes the adjustments of final design choices, testing, and deployment as well as the validation and commissioning of the new 2 GeV injection kicker system. The upgrade pays particular attention to the reduction of pulse reflections unavoidably induced by a magnet in short circuit mode configuration whilst keeping a fast 10⁴ ns rise and fall time. An adapted thyratron triggering system to reduce jitter and enhance thyratron lifetime is outlined. Additionally, improvements to the magnet entry box and the elimination of SF6 gas in the magnet connection box and the associated pulse transmission lines are discussed.
Copyright/License publication: © 2021 (License: CC-BY-3.0)

Corresponding record in: Inspire


 Record creato 2022-06-10, modificato l'ultima volta il 2022-06-11


Testo completo:
Scarica documento
PDF