Nothing Special   »   [go: up one dir, main page]

CERN Accelerating science

Article
Title Photostimulated desorption performance of the future circular hadron collider beam screen
Author(s) González, L A (CERN) ; Baglin, V (CERN) ; Chiggiato, P (CERN) ; Garion, C (CERN) ; Kersevan, R (CERN) ; Casalbuoni, S (KIT, Karlsruhe ; European XFEL, Hamburg) ; Grau, A (KIT, Karlsruhe) ; de Jauregui, D Saez (KIT, Karlsruhe) ; Bellafont, I (CELLS - ALBA, LLS) ; Pérez, F (CELLS - ALBA, LLS)
Publication 2021
Number of pages 9
In: Phys. Rev. Accel. Beams 24 (2021) 113201
DOI 10.1103/PhysRevAccelBeams.24.113201 (publication)
Subject category Accelerators and Storage Rings
Study CERN FCC
Abstract Synchrotron radiation (SR) originated at superconducting bending magnets is known to be at the origin of several beam detrimental effects related to vacuum instabilities. One of the major challenges in the design of the vacuum beam pipes of high-energy hadron colliders is the SR coping strategy. In the case of the future circular hadron collider (FCC-hh), a Cu-coated beam screen (BS) operating in the range of 40–60 K has been designed with the aim of protecting the superconducting magnet cold bores from direct synchrotron irradiation. In order to experimentally study the FCC-hh BS vacuum and cryogenic performance, two sample prototypes were manufactured and installed in the beam screen test-bench experiment (BESTEX) at the Karlsruhe Research Accelerator (KARA) at the Karlsruhe Institute of Technology (KIT). The emitted SR has a critical energy of 6.2 keV, very similar to the 4.6 keVof FCC-hh. Irradiation at both room (RT) and cryogenic (77 K) temperatures showed a significant reduction of the molecular photostimulated desorption yields (η) of the FCC-hh beam screen compared to those of Cu samples. A first approximation of η and its evolution with the photon dose accumulated on the FCC-hh BS prototype at 77 K allows to estimate that a machine conditioning period of ∼1.2 months would be needed to reduce the photostimulated molecular density at the necessary levels to ensure a 100 h beam lifetime at nominal FCC-hh operation.
Copyright/License publication: © 2021-2024 authors (License: CC BY 4.0)

Corresponding record in: Inspire


 Registro creado el 2021-11-17, última modificación el 2021-11-23


Texto completo:
Descargar el texto completo
PDF