Nothing Special   »   [go: up one dir, main page]

CERN Accelerating science

Published Articles
Title Crab cavity and cryomodule development for HL-LHC
Author(s) Carra, Federico (CERN) ; Amorim Carvalho, Alexandre (CERN) ; Artoos, Kurt (CERN) ; Atieh, Said (CERN) ; Aviles Santillana, Ignacio (CERN) ; Belomestnykh, Sergey (RIKEN BNL) ; Boucherie, Antoine (CERN) ; Brachet, Jean-Pierre (CERN) ; Brodzinski, Krzysztof (CERN) ; Burt, Graeme (Lancaster U.) ; Calaga, Rama (CERN) ; Capatina, Ofelia (CERN) ; Capelli, Teddy (CERN) ; Dassa, Luca (CERN) ; De Silva, Subashini (Old Dominion U.) ; Delayen, Jean (Old Dominion U.) ; Dijoud, Thibault (CERN) ; Mainaud Durand, Helene (CERN) ; Favre, Gilles (CERN) ; Ferreira, Leonel (CERN) ; Freijedo Menendez, Paula (CERN) ; Garlaschè, Marco (CERN) ; Guinchard, Michael (CERN) ; Jones, Thomas (Daresbury) ; Kuder, Norbert (CERN) ; Langeslag, Stefanie (CERN) ; Leuxe, Raphael (CERN) ; Li, Zenghai (SLAC) ; Macpherson, Alick (CERN) ; Marinov, Kiril (Daresbury) ; Minginette, Pierre (CERN) ; Montesinos, Eric (CERN) ; Motschmann, Fritz (CERN) ; Nicol, Thomas (Fermilab) ; Olave, Rocio (Old Dominion U.) ; Parente, Claudia (CERN) ; Park, HyeKyoung (Old Dominion U.) ; Pattalwar, Shrikant (Daresbury) ; Prever-Loiri, Laurent (CERN) ; Pugnat, Dominique (CERN) ; Ratti, Alessandro (LBNL, Berkeley) ; Rigutto, Emilien (CERN) ; Rude, Vivien (CERN) ; Sosin, Mateusz (CERN) ; Templeton, Niklas (Daresbury) ; Vandoni, Giovanna (CERN) ; Verdú-Andrés, Silvia (RIKEN BNL) ; Villiger, Gilles (CERN) ; Wu, Qiong (RIKEN BNL) ; Xiao, Binping (RIKEN BNL) ; Zanoni, Carlo (CERN)
Publication 2015
Number of pages 7
In: 17th International Conference on RF Superconductivity, Whistler, Canada, 13 - 18 Sep 2015, pp.FRBA02
DOI 10.18429/JACoW-SRF2015-FRBA02
Subject category Accelerators and Storage Rings
Accelerator/Facility, Experiment HL LHC
Abstract The HL-LHC project aims at increasing the LHC luminosity by a factor 10 beyond the design value. The installation of a set of RF Crab Cavities to increase bunch crossing angle is one of the key upgrades of the program. Two concepts, Double Quarter Wave (DQW) and RF Dipole (RFD) have been proposed and are being produced in parallel for test in the SPS beam before the next long shutdown of CERN accelerator’s complex. In the retained concept, two cavities are hosted in one single cryomodule, providing thermal insulation and interfacing with RF coupling, tuning, cryogenics and beam vacuum. This paper overviews the main design choices for the cryomodule and its different components, which have the goal of optimizing the structural, thermal and electro-magnetic behavior of the system, while respecting the existing constraints in terms of integration in the accelerator environment. Prototyping and testing of the most critical components, manufacturing, preparation and installation strategies are also described.
Copyright/License CC-BY-3.0

Corresponding record in: Inspire


 Record creato 2017-10-12, modificato l'ultima volta il 2017-10-13


Testo completo:
Scarica documento
PDF