Nothing Special   »   [go: up one dir, main page]

CERN Accelerating science

Article
Report number arXiv:1006.0089 ; IPAC-2010-WEPD018
Title Status of COLDDIAG: A Cold Vacuum Chamber for Diagnostics
Related titleStatus of COLDDIAG: A Cold Vacuum Chamber for Diagnostics
Author(s) Gerstl, Stefan (KIT, Karlsruhe) ; Baumbach, Tilo (KIT, Karlsruhe) ; Casalbuoni, Sara (KIT, Karlsruhe) ; Grau, Andreas (KIT, Karlsruhe) ; Hagelstein, Michael (KIT, Karlsruhe) ; Saez de Jauregui, David (KIT, Karlsruhe) ; Baglin, Vincent (CERN) ; Boffo, Cristian (Babcock Noell, Wuerzburg) ; Sikler, Gunther (Babcock Noell, Wuerzburg) ; Bradshaw, Thomas (Rutherford) ; Cimino, Roberto (INFN, Rome) ; Commisso, Mario (INFN, Rome) ; Spataro, Bruno (INFN, Rome) ; Clarke, James (Daresbury) ; Scott, Duncan (Daresbury) ; Cox, Matthew (Diamond Light Source) ; Schouten, Jos (Diamond Light Source) ; Jones, Roger (Manchester U.) ; Shinton, Ian (Manchester U.) ; Mostacci, Andrea (Rome U.) ; Wallen, Erik (Lund U., MAX-lab) ; Weigel, Ralf (Stuttgart, Max Planck Inst.)
Publication 2010
Imprint 02 Jun 2010
Number of pages 3
Note Comments: Presented at First International Particle Accelerator Conference, IPAC'10, Kyoto, Japan, from 23 to 28 May 2010
Presented at First International Particle Accelerator Conference, IPAC'10, Kyoto, Japan, from 23 to 28 May 2010
In: 1st International Particle Accelerator Conference, Kyoto, Japan, 23 - 28 May 2010, pp.WEPD018
Subject category Accelerators and Storage Rings
Abstract One of the still open issues for the development of superconducting insertion devices is the understanding of the beam heat load. With the aim of measuring the beam heat load to a cold bore and the hope to gain a deeper understanding in the beam heat load mechanisms, a cold vacuum chamber for diagnostics is under construction. The following diagnostics will be implemented: i) retarding field analyzers to measure the electron energy and flux, ii) temperature sensors to measure the total heat load, iii) pressure gauges, iv) and mass spectrometers to measure the gas content. The inner vacuum chamber will be removable in order to test different geometries and materials. This will allow the installation of the cryostat in different synchrotron light sources. COLDDIAG will be built to fit in a short straight section at ANKA. A first installation at the synchrotron light source Diamond is foreseen in June 2011. Here we describe the technical design report of this device and the planned measurements with beam.

Corresponding record in: Inspire


 Registre creat el 2010-06-02, darrera modificació el 2024-12-04


Text complet:
wepd018 - Descarregar el text completPDF
arXiv:1006.0089 - Descarregar el text completPDF
Enllaç extern:
Descarregar el text completFull-text at JACoW Server