Abstract
| Pohang Accelerator Laboratory (PAL) had developed and installed a Multipole Wiggler (MPW14) to utilize high energy synchrotron radiation at Pohang Light Source (PLS). The MPW14 is a hybrid type device with period of 14 cm, minimum gap of 14 mm, maximum flux density of 2.02 Tesla and total magnetic structure length of 2056 mm. The support locations and structure of an insertion device are optimized to achieve a minimum deflection due to the magnetic loads. A Finite Element Analysis (FEA) is performed to find out the amount of maximum deflection and optimal support positions on the backing beam, the support and drive structures of the MPW14 under expected magnetic load of 14 tons. To reduce the deflection effect further, two springs are designed and installed to compensate the gap dependent magnetic loads. The optimized deflection is estimated to be about 20.6 ? while the deflection before optimization is 238 ?. |