Nothing Special   »   [go: up one dir, main page]

CERN Accelerating science

Article
Report number CERN-AB-2005-030 ; CLIC-Note-635
Title 30 GHz Power Production in CTF3
Author(s) Wuensch, Walter (CERN) ; Achard, Claude (CERN) ; Braun, Hans Heinrich (CERN) ; Carron, Georges (CERN) ; Corsini, Roberto (CERN) ; Grudiev, Alexei (CERN) ; Heikkinen, Samuli Tapio (CERN) ; Schulte, Daniel (CERN) ; Sladen, Jonathan P H (CERN) ; Syratchev, Igor V (CERN) ; Tecker, Frank A ; Wilson, Ian H (CERN)
Publication 2005
Imprint 17 Jun 2005
Number of pages 4
In: 21st IEEE Particle Accelerator Conference, Knoxville, TN, USA, 16 - 20 May 2005, pp.1695
Subject category Accelerators and Storage Rings
Accelerator/Facility, Experiment CLIC ; CTF3
Abstract One of the major objectives of CTF3 (CLIC Test Facility) is the production of 30 GHz power for the high-gradient testing of CLIC accelerating structures. To this end a dedicated beam line, power generating structure and power transfer line have been designed, installed and commissioned. 52 MW of 30 GHz power with a pulse length of 74 ns and a repetition rate of 16 Hz were delivered to the high-gradient test area. This will allow operation of test accelerating structures in the first CTF3 run of 2005 up to the nominal CLIC accelerating gradient of 150 MV/m and beyond the nominal pulse length. The system is described and the performances of the CTF3 linac, beam line and the rf components are reviewed.

Corresponding record in: Inspire
Email contact: Tjitske.Kehrer@cern.ch


 Rekord stworzony 2005-06-17, ostatnia modyfikacja 2024-10-25


Access to fulltext document:
Pobierz pełny tekst
PDF